Behind the Scenes with Mantra

Check out our latest behind the scenes video with the super talented hip-hop artist and all around good guy Mantra. This is our most extensive video update yet, and Mantra takes us through the process of creating some of Play It Safe's original music, the relationship between improvised music and acting, as well as the music video for his track "The Fear" which was created by the core creative team behind Play It Safe.

Behind the Scenes with Alasdair Tremblay-Birchall

We're excited to release our third behind the scenes interview, this time with the one and only Alasdair Tremblay-Birchall! Alasdair is a rising star in the Melbourne comedy scene and he's worked on a ton of great projects so far, including Shaun Micallef's MAD AS HELL, ABC iview's Australia Think Tank, and the great podcast Two In The Think Tank.

Play It Safe - Trailer

This week has been incredibly exciting for the whole Play It Safe team as after almost four years of hard work the trailer is now online! It's a massive milestone for all of us, and it feels amazing to finally be able to share what we've been working on so hard for so long.

Play It Safe - Picture Lock

This week we hit a massive milestone: Play It Safe is officially picture locked! After about a year and half of editing (and three and a half years since I first started the project) I now have a final edit sitting on my computer!

Mantra – The Fear: Behind The Scenes (Part 2)

As promised, here's my second post looking behind the scenes on my recent video for Mantra's "The Fear". If you haven't already, check out the first post here which takes a look at the clip's development and first day of shooting.

Play It Safe - Video Update #2

Hey guys, massive apologies for the big delay in updates. At long last we have another video update online! We actually shot this several months back, but all the info is still legit so check it out here if you have a few spare minutes...

Behind The Scenes: Blocks 09 and 10

Hey guys, I thought it was high time for another quick update on how Play It Safe is coming along. Post production is going very well, and we screened the entire film for some of our core crew members for the first time a few weeks ago. Not only was is very rewarding to be able to show the guys what they've been working so hard on for so long, but it was amazing to get their feedback on how the edit is coming along. Right now, Raechel and I are working hard on our third cut of the film and we'll be testing it on some real audience members (i.e. people who weren't involved in the film's production) for the very first time within the next two weeks!

Act 1 Roughcut Screening

Last week we hit another milestone in post-production as we screened the first half hour of Play It Safe for some our key team members (including cinematographer Sherwin Akbarzadeh, music supervisor & AP Oscar O'Bryan, and my good pal & longtime-collaborator Maia Tarrell). This was the very first time anyone other than Raechel and I had watched such a large chunk of the film which made the event equal parts exciting and nerve wracking. It was all smooth sailing once we got going though, and Rae & I collected a boatload of really valuable feedback. We're already back hard at work tweaking the edit with the aim for all five of us to reconvene to review the entire film within the next month.

Review of First Assembly

I am very happy to announce that after more than two and half years we now not only have a film "in the can", but we have a film that can actually be watched!

Quick Update: July 2013

Welp, I'm ashamed to say that this update is very much overdue! A massive amount has happened since my last proper post in December last year, and while I often intended to write updates I've unfortunately found myself much too busy. However, the good news is that I've been busy working hard on Play It Safe! So much so that we wrapped up principle photography in early April, AND now we are only a couple of weeks away from having our first assembly!